top of page

Honda cuts production at Suzuka plant by 30% early September, Saitama plant cuts production by 40%

Updated: Aug 29, 2022



Honda announced on the 25th that it will reduce production by about 30% at the first and second lines of its Suzuka Factory (Suzuka City, Mie Prefecture) in early September. The company plans to reduce production by about 30% by the end of August, as semiconductor shortages and logistics disruption continue.

On the other hand, Saitama Factory's finished vehicle plant, which is scheduled to cut production by about 10% in August, is expected to cut production by about 40% in early September.

Read More Here (Japanese): https://tinyurl.com/ycyrd6dt

Original News Source: (c) Reuters-MSN

Comments


bottom of page